CONVENTION CENTER OF BAKU
Delivery Date : June 2015 Azerbaijan / Baku
Main Conctractor: İLK Construction
Construction Area: 146.000 m²
- Location : Azerbaijan / Baku
- Main Conctractor: İLK Construction
- Construction Area: 146.000 m² – Auditorium with 3.500 seats, 15 Convention Halls with 1.250 seats
- Delivery Date : June 2015
- Scope of Works : Turn Key MEP Systems
- Building Management System
- Heating, Ventilation, and Air Conditioning Systems
- Waste Water & Plumbing
- Natural Gas System
- Rainwater System
- Air Conditioning & Ventilation System
- Fire Detection, Extinguishing and Alarm Systems
- Water Treatment & Softener System
- Smoke Exhaust & Pressurizing Control System
- Medium Voltage and Low Voltage Distribution and Applications
- Transformers, generators, MDP and UPS
- BMS Automation and Control System
- Videowalls – Large Screens
- Information Technologies
- TV Stream and TV Distribution System
- 84 Broadcast Connection Spots
- 3 Outdoor OB Van Connection Spots
- 32.275 mt. Hybrid F/O Fiber Optic FRNC FMW fp / LEMO PEW fs Cable
- Multiview Platform System
- Emergency Announcement Systems
- Weak Current Systems
- IP TV and Digital Board Systems
- IT Active and Passive Equipment, Indoor and Outdoor Wi-Fi System
- Professional Audio, Lighting and Stage System Designing and Applications
- Professional Stage Systems
- Access Control System
- Lighting Automation (DALI)
- Lighting Scenarios, Motor-driven Shade and Curtain Control and Automation
- Testing and Commissioning Services