- Location : Azerbaijan / Baku
- Main Conctractor: AIKON CPIT
- Construction Area: 7.200 m²
- Delivery Date : December 2013
- Scope of Works : Turn Key MEP Systems
- Building Management System
- Heating, Ventilation, and Air Conditioning Systems
- Waste Water & Plumbing
- Natural Gas System
- Rainwater System
- Air Conditioning & Ventilation System
- Fire Detection, Extinguishing and Alarm Systems
- Water Treatment & Softener System
- Smoke Exhaust & Pressurizing Control System
- Low Voltage Distribution and Applications
- Transformers, generators, MDP and UPS
- BMS Automation and Control System
- IT Active and Passive Equipment, Indoor and Outdoor Wi-Fi System
- Lightning Protection & Lightning Automation (DALI)
- Electric Power Distribution Line, Cable Tray
- Low Current Systems
- Professional Audio/Visual, Lighting and Stage System Designing and Applications
- Access Control System
- Lighting Scenarios, Motor-driven Shade and Curtain Control and Automation
- IP CCTV System
DIAQNOSTIC CENTER – BAKU
