- Location : Azerbaijan / Baku
- Main Conctractor: DIA Holding
- Construction Area: 135.000 m²
- Delivery Date : June 2013
- Scope of Works :
- Project MEP design and installation services
- Sanitary System Services / Plumbing
- Air Conditioning and Ventilation System
- Smoke Exhaustion and Pressure Control System
- Air Duct Manufacturing and Installation
- Building Management System (18.000 points), Modbus / LonWorks / BACnet Integration
- Testing and Commissioning Services
FLAME TOWERS
